Landscaping Highwic Ave
Project Brief:
There were two main aspects to this project. The first being to lay artificial turf over the old lawn area and the other to remove the existing garden and re-landscape the area.
Before:
Overgrown, crowded garden bed with plants that compete with one another and multiple undesirable species such as Agapanthus and self seeded palm trees.
What we did to meet the objectives:
- Removed the old lawn, laid and compacted a gravel base and installed premium artificial turf
- Removed old garden plants, prepared the area, laid weedmat, installed an irrigation system and re-planted the areas
During:
After: